
Typically 3 to 5 days for an average kitchen.
Central Texas clay soil makes slabs move with wet and dry seasons, which is why cracked tile lines are common in Austin kitchens. Floors are checked for flat and level first, cracks are treated with an isolation membrane under tile, and luxury vinyl plank or engineered wood is used where a floating floor suits the slab better. When the floor runs into the living room, it can continue through so there is no threshold line.
After the in-home measure, the scope is written out with materials, labor and any permit or inspection steps on separate lines, and nothing is ordered until you approve it. For a sense of scale, HomeAdvisor puts a typical Austin kitchen remodel at $13,058 - $32,739, averaging about $20,204.

Full Kitchen Remodel

Kitchen Cabinet Replacement & Refacing

Quartz & Granite Countertop Installation

Kitchen Islands & Open Layouts

Backsplash & Kitchen Tile

Kitchen Lighting & Electrical Updates

Small Kitchen Refresh
Also in West Lake Hills, Lakeway, Bee Cave, Dripping Springs, Cedar Park, Leander, Liberty Hill, Round Rock, Georgetown, Pflugerville, Buda, Kyle.