Full Kitchen Remodel in an Austin, TX home
Full remodel in Austin

Full Kitchen Remodel

Usually 6 to 10 weeks on site, after cabinets are ordered.

About this work

Everything comes out down to the studs and subfloor: cabinets, counters, soffits, flooring, old lighting. That is the point where problems hidden for decades show up, like a cast iron drain that is half closed off, a range circuit that was never sized for an induction cooktop, or a sagging floor under the old dishwasher. A full remodel lets the room be re-planned around how you cook, with plumbing, electrical and ventilation brought up to current code under one permit.

How it is priced

After the in-home measure, the scope is written out with materials, labor and any permit or inspection steps on separate lines, and nothing is ordered until you approve it. For a sense of scale, HomeAdvisor puts a typical Austin kitchen remodel at $13,058 - $32,739, averaging about $20,204.

Request a design visit