Remodeled kitchen with a quartz island and pendant lights in Cedar Park, Texas
Kitchen remodels in Cedar Park

Kitchen Remodels Cedar Park

Opening up 1990s floor plans and replacing builder kitchens, priced up front.

In-home measure

Every wall, window and outlet measured before design.

Written scope

Line-by-line materials and price, signed before demo.

Permits handled

Plumbing, electrical and wall changes permitted and inspected.

One schedule

Cabinets ordered first, so the kitchen is out of use for less time.

Start with the size of the job

Three ways to remodel a kitchen

1 to 2 weeks on site

Refresh

Same layout and cabinet boxes. New cabinet finish, hardware, sink, faucet, backsplash and lighting.

Good fit: Selling soon, rentals, kitchens that work but look dated.

2 to 5 weeks on site

Surfaces and cabinets

Same footprint, new everything you see: cabinets, quartz or granite, tile, flooring and lights.

Good fit: Builder-grade or 1990s kitchens with a layout you like.

6 to 10 weeks on site

Full remodel

Down to the studs. New layout, island or removed wall, plumbing and electrical moved and brought to code.

Good fit: Closed or cramped kitchens, older homes, a kitchen you want to rethink.

Kitchen remodeling services in Cedar Park

Each one can be a project on its own or part of a full remodel. Open any of them for what is included and how long it takes.

Kitchen designer measuring a kitchen with a homeowner in Cedar Park

Remodeling a kitchen in Cedar Park

Cedar Park grew quickly in the 1980s and 1990s, and a large share of its homes now have kitchens that are 25 to 35 years old. The floor plans of that era often put the kitchen behind a half wall or a peninsula with a soffit above it.

A frequent Cedar Park project is removing the soffits so the uppers can run to the ceiling, replacing the peninsula with an island, and moving from tile or laminate counters to quartz. Original vinyl or tile floors usually come up at the same time.

The City of Cedar Park runs its own building permits and inspections; HOAs in neighborhoods like Buttercup Creek and Ranch at Brushy Creek mostly care about dumpsters and working hours.

Near Brushy Creek Lake ParkNear H-E-B CenterNear Lakeline MallNear Whitestone Boulevard

ZIP codes: 78613, 78630.

What kitchen remodels cost in Austin

Published figures for the Austin area, so you can set a budget before the first visit. Your own price comes after the measure, written out line by line.

Typical Austin kitchen remodel

$13,058 - $32,739

Average about $20,204

Source: HomeAdvisor, kitchen remodel cost in Austin, TX

ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$25,463119.8%
Major kitchen remodel, midrange$75,73751.4%
Major kitchen remodel, upscale$148,31337.3%

Source: Cost vs. Value 2025, Austin, TX (Journal of Light Construction)

Cabinets and countertops are usually the two biggest lines. Moving plumbing, removing a bearing wall or adding circuits adds cost; keeping the layout saves it.

From first visit to finished kitchen

Cedar Park is about 30 minutes north on US 183 from central Austin; the design visit happens at your home.

Cabinets being installed during a kitchen remodel in Cedar Park
  1. 1

    Measure and listen

    A visit to the kitchen: measurements, photos, what bothers you about it, how you cook and what has to stay.

  2. 2

    Plan and choose

    A scaled layout, then cabinets, counters, tile and fixtures picked with samples in hand.

  3. 3

    Written scope and price

    Every line on paper, including permits and inspections when the job needs them. You approve before anything is ordered.

  4. 4

    Order, then demolish

    Cabinets and long-lead items are ordered first. Demolition starts once their delivery date is close.

  5. 5

    Build

    Rough-in, inspections, drywall, cabinets, template, counters, tile, flooring and paint, in that order.

  6. 6

    Walkthrough

    A punch list walk together, appliances tested, and the kitchen handed back clean.

Useful to have before the first visit

None of it is required, but it makes the first conversation faster and the estimate closer to final.

  • A few photos of the kitchen from each corner
  • A rough budget range you are comfortable with
  • Appliances you are keeping or want to buy
  • Pictures of kitchens you like, even from magazines
  • Your HOA rules on dumpsters and work hours, if any

Questions before a remodel

Sometimes nothing, sometimes a duct, a vent pipe or wiring. The soffit is opened at one end during the measure or demolition so the plan knows whether it can come out completely or whether one run has to be rerouted or boxed neatly.

Request a design visit

Tell us about the kitchen and the timing you have in mind. You will get a call back to set up the in-home measure in Cedar Park.

Kitchen Remodels Austin

9442 N Capital of Texas Hwy #350, Austin, TX 78759

Mon-Fri: 8:00 AM - 6:00 PM

Sat: 9:00 AM - 2:00 PM (design visits)

Ready to see what your kitchen could be?

Call to book the measure, or text a few photos and get a first idea of scope for your Cedar Park home.