Remodeled kitchen with a quartz island and pendant lights in Austin, Texas
Kitchen remodeling across Austin

Kitchen Remodels Austin

Measured in your home, planned on paper, priced line by line before demolition.

In-home measure

Every wall, window and outlet measured before design.

Written scope

Line-by-line materials and price, signed before demo.

Permits handled

Plumbing, electrical and wall changes permitted and inspected.

One schedule

Cabinets ordered first, so the kitchen is out of use for less time.

Start with the size of the job

Three ways to remodel a kitchen

1 to 2 weeks on site

Refresh

Same layout and cabinet boxes. New cabinet finish, hardware, sink, faucet, backsplash and lighting.

Good fit: Selling soon, rentals, kitchens that work but look dated.

2 to 5 weeks on site

Surfaces and cabinets

Same footprint, new everything you see: cabinets, quartz or granite, tile, flooring and lights.

Good fit: Builder-grade or 1990s kitchens with a layout you like.

6 to 10 weeks on site

Full remodel

Down to the studs. New layout, island or removed wall, plumbing and electrical moved and brought to code.

Good fit: Closed or cramped kitchens, older homes, a kitchen you want to rethink.

Kitchen remodeling services in Austin

Each one can be a project on its own or part of a full remodel. Open any of them for what is included and how long it takes.

Kitchen designer measuring a kitchen with a homeowner in Austin

What an Austin kitchen remodel usually involves

An Austin kitchen remodel can mean very different jobs depending on the street. A 1940s cottage in Bouldin Creek or Hyde Park often has a narrow kitchen at the back of the house, a ranch house in Allandale or Crestview has the closed U-shaped layout of the 1960s, and a 2000s home in Circle C or Avery Ranch has builder-grade oak cabinets and tile counters that simply look tired.

In older central neighborhoods the work usually starts with what is behind the walls: galvanized supply lines, ungrounded circuits, a range on a 30 amp line. In the suburbs built since the 1990s the bones are newer, so the budget goes into cabinets, quartz, an island and opening the kitchen to the family room.

Inside the city limits, moving plumbing, adding circuits or taking out a wall goes through City of Austin Development Services, with inspections before the walls close. Cabinet, counter and tile swaps in place generally do not need a permit.

Near Zilker ParkNear MuellerNear TarrytownNear South Lamar

ZIP codes: 78701-78759 and the rest of the city.

What kitchen remodels cost in Austin

Published figures for the Austin area, so you can set a budget before the first visit. Your own price comes after the measure, written out line by line.

Typical Austin kitchen remodel

$13,058 - $32,739

Average about $20,204

Source: HomeAdvisor, kitchen remodel cost in Austin, TX

ProjectJob costRecouped at resale
Minor kitchen remodel, midrange$25,463119.8%
Major kitchen remodel, midrange$75,73751.4%
Major kitchen remodel, upscale$148,31337.3%

Source: Cost vs. Value 2025, Austin, TX (Journal of Light Construction)

Cabinets and countertops are usually the two biggest lines. Moving plumbing, removing a bearing wall or adding circuits adds cost; keeping the layout saves it.

From first visit to finished kitchen

The order matters: nothing is torn out until the materials are on their way.

Cabinets being installed during a kitchen remodel in Austin
  1. 1

    Measure and listen

    A visit to the kitchen: measurements, photos, what bothers you about it, how you cook and what has to stay.

  2. 2

    Plan and choose

    A scaled layout, then cabinets, counters, tile and fixtures picked with samples in hand.

  3. 3

    Written scope and price

    Every line on paper, including permits and inspections when the job needs them. You approve before anything is ordered.

  4. 4

    Order, then demolish

    Cabinets and long-lead items are ordered first. Demolition starts once their delivery date is close.

  5. 5

    Build

    Rough-in, inspections, drywall, cabinets, template, counters, tile, flooring and paint, in that order.

  6. 6

    Walkthrough

    A punch list walk together, appliances tested, and the kitchen handed back clean.

Useful to have before the first visit

None of it is required, but it makes the first conversation faster and the estimate closer to final.

  • A few photos of the kitchen from each corner
  • A rough budget range you are comfortable with
  • Appliances you are keeping or want to buy
  • Pictures of kitchens you like, even from magazines
  • Your HOA rules on dumpsters and work hours, if any

Questions before a remodel

Interior work like a kitchen generally is not reviewed by the Historic Landmark Commission, which looks at exterior changes. If the remodel also changes windows, adds a bump-out or alters the outside of a house in a local historic district, that part needs historic review. We check the address before the plan is finalized.

Request a design visit

Tell us about the kitchen and the timing you have in mind. You will get a call back to set up the in-home measure.

Kitchen Remodels Austin

9442 N Capital of Texas Hwy #350, Austin, TX 78759

Mon-Fri: 8:00 AM - 6:00 PM

Sat: 9:00 AM - 2:00 PM (design visits)

Ready to see what your kitchen could be?

Call to book the measure, or text a few photos and get a first idea of scope.